Category Archives: Transit Infrastructure

Will unilateral approval of KiDEx fracture the Selangor Government?

TRANSIT took note of the increasingly public disagreement within the Selangor Government about the prioritization of the Kinrara-Damansara expressway also known as the KiDEx ” skyway.”

4 ADUNs from Petaling Jaya have already expressed their opposition to the approval of the expressway and called for greater transparency and suggested that the corridor would be better used for public transport. There is a public group of residents expressing their concerns. Azman Ali, a member of the government and a challenger for Menteri Besar, has also expressed his dismay at the project saying that the government was putting the cart before the horse.

In response the Menteri Besar has said that not building the highway would be unfair to the developer.

Continue reading Will unilateral approval of KiDEx fracture the Selangor Government?

Haphazard halts are a sign of haphazard planning and policy and organization and management….and especially leadership.

TRANSIT took note of this article in the Star Metro which reminded us how much more needs to be done to improve public transport organization and management in the Klang Valley.

Haphazard halts (The Star Metro,  29 April 2014)

MORE often than not, public buses in the Klang Valley can be seen stopping to pick up passengers willy-nilly, be it by the roadside, along a flyover or even at the junction of a busy main road.

The lack of a proper bus stop or lay-by, does not seem to faze the drivers and the practise has been going on for years.

However, their actions not only contribute to traffic congestion but also pose a threat to life and limb as passengers scramble to board the bus on a busy road.

Continue reading Haphazard halts are a sign of haphazard planning and policy and organization and management….and especially leadership.

This proposed expressway should be Petaling Jaya’s LRT or MRT line!

[Admin; TRANSIT has long objected to the proposed Kinrara Damansara Expressway, as you can see from this draft post which we created 2 years ago]

TRANSIT took note of the proposal to build an elevated expressway through the heart of Petaling Jaya.

TRANSIT opposes the expressway proposal and strongly recommends that the corridor be used to build a north-south rapid transit corridor, likely a monorail or LRT line. We expect that this would cost the same or less than the proposed expressway, occupy less visual space and obviously would not bring pollution on site.

Image showing the alignment of the Kinrara-Damansara expressway, proposed in Budget 2011.

As public transportation this corridor would connect with 4 public transport corridors (either existing/under construction)…the existing KTM Komuter line in PJ Old Town, the Kelana Jaya LRT Line at Taman Jaya, and the LRT extension in Kinrara and the MRT Line, both currently under construction. There is also the proposed Federal Highway Bus Rapid Transit corridor.

This has far greater connection potential than an expressway and will move 10 times as many people.

TRANSIT Says:

We see that cities across the world are in the process of taking down elevated expressways and improving their urban realms…while we in Malaysia are unfortunately looking at building more.

We have an opportunity here to build a lasting legacy for public transportation in Petaling Jaya…let’s not mess this up.

Prasarana deals with neighbours affected by KL Monorail extension project

TRANSIT took note of the following interesting article, which describes Prasarana refusing to pay compensation to the residents of the Tong Weng Mansion in Brickfields, while agreeing to pay compensation to two other site owners in the area.

The compensation requests are in relation to the KL Monorail expansion project, which will extend the KL Monorail from the Tun Sambanthan station down to MidValley and to Old Klang Road on the other side of the Federal Highway.

Interestingly enough, all three compensation requests are in relation to properties that are illegally occupying government land – a situation that seems to occur more frequently than one might expect.

Prasarana rejects appeal for funds (Star-Metro Central)

Monday February 27, 2012
By CHARLES FERNANDEZ
metro@thestar.com.my

SYARIKAT Prasarana Negara Berhad (Prasarana) has rejected an appeal for compensation from residents of Tong Weng Mansion in Brickfields.

The residents had appealed for compensation after a badminton court was fenced off for a monorail extension project.

The residents also used the badminton court, which was on government land, as an area for activities such as gatherings and funeral services.

Residents’ association chairman G.S. Maniam said Prasarana had only paid compensation to two temples that had also illegally occupied government land.

“We know it is not our land but we would like some compensation as the money could be used to build a wall between the project site and the mansion,’’ said Maniam.

So close: The project site, behind the blue hoarding, is located directly behind the apartment building. Image courtesy of The Star.

Continue reading Prasarana deals with neighbours affected by KL Monorail extension project

Work on underground section of Jakarta Metro begins

TRANSIT took note that construction of the Jakarta Metro began on April 4th.

The Jakarta Metro network will eventually have 2 lines (North-south and East-West) essentially following the path first blazed by the Transjakarta bus service nearly a decade ago.

Work on underground section of Jakarta Metro begins (Railway Gazette, 10 April 2014)

Project manager Mass Rapid Transit Jakarta announced that work started on the underground section of Jakarta’s first metro line on April 4.

Excavation began at Hotel Indonesia Traffic Circle, where there will be an underground station. A guide wall is due to be completed within three months, which will allow a diaphragm wall to be built. The timescale for the completion of this and subsequent station works is four years.

In May the city authorities announced the winners of the tenders for the three underground civil works packages. Sumitomo Mitsui Construction Company and PT Hutama Karya is undertaking the work at Hotel Indonesia Traffic Circle, whereas the other two packages are being carried out by a consortium of Shimizu, Obayashi, Wijaya Karya and Jaya Konstruksi.

Two of the three elevated civil works packages will be carried out by a Tokyu-WIKA consortium, with a consortium of Obayashi, Shimizu and Jaya Konstruksi responsible for the other.

Revenue operations on the 15·7 km line are planned to start in early 2018. An 8·1 km northern extension is planned as the second phase.

TRANSIT Says:

For more information about the Jakarta MRT you can visit the website jakartamrt.com, follow @mrtjakarta on Twitter or see the Wikipedia page.

KLIA 2 opens May 2nd. ERL offering 1000 trial rides.

TRANSIT took note of the following news regarding the opening of KLIA 2 and public transport services to the new airport terminal :

ERL service to KLIA 2 opens on May 2

(The Star, 22nd April 2014)

By Patrick Lee

The Express Rail Link from KL Sentral to KLIA2 will commence operations when the airport terminal opens to the public on May 2. There is more good news in store.

The airport’s rail company Express Rail Link (ERL) is allowing 1,000 people to have free trial rides to KLIA2 on Malaysian Airports Holdings Berhad’s KLIA2 Open Day on Sunday. Those interested can register on a first-come first-served basis from tomorrow at http://www.kliaekspres.com.

Additional information after the jump!

Continue reading KLIA 2 opens May 2nd. ERL offering 1000 trial rides.

Selangor Government makes unwise decision to proceed with study of elevated highway through Petaling Jaya

TRANSIT took note of the unfortunate news that the Selangor Government will move ahead with studies for the Kinrara Damansara Expressway, also known as KiDEx or the KiDEx “skyway” (a falsely romanticized name just as false as the pictures on their website)

Selangor approves studies on plan for elevated highway, KiDEx (The Malay Mail, 11 April 2014)

The Selangor state government has approved studies to be conducted on the controversial Kinrara-Damansara Expressway (KIDEX) project, Tan Sri Khalid Ibrahim said today.

The Selangor mentri besar also said that public hearings will be held once the studies are completed.

The project has come under heavy criticism from residents worried about pollution and the lack of publicly available details.

TRANSIT Says:

Continue reading Selangor Government makes unwise decision to proceed with study of elevated highway through Petaling Jaya

First 2 of 4 car monorail train sets to begin service in August 2014

TRANSIT took note of the announcement from Prasarana that 4 car service on the KL Monorail is expected to begin in August of 2014. All 12 trains are expected to be in service by September 2015.

Video

KL Monorail’s new four-car train to start operation in August (The Star, 9 April 2014)

This comes after the first two trains were delivered by Scomi Rail in Rawang to the depot in Brickfields for testing and commissioning in late January of 2014
New four car monorail trains arrive at depot (The Star, 25 January 2014)

The new 4 carriage trains can carry 430 passengers and will have space for wheelchairs. The monorail stations are being retrofitted with chair lifts (presumably the ones that attach to stairways? Or proper lifts?) and work is expected to be finished soon.

TRANSIT Says:

As you can imagine, we are pleased to see improvements to our public transport services…even incremental ones. The KL Monorail is already a decade old and was horribly over capacity in 2005…so the new carriages are a welcome addition.

Indeed, seeing 4-carriage monorail trains may help raise public confidence that the monorail can be more than just a “toy train” and there may be demand for applications of monorail technology in other cities in the Klang Valley, such as Petaling Jaya in place of the proposed Kinrara Damansara Expressway. TRANSIT has long said that the Sunway BRT line with its RM100 million per km cost, might have been better as a monorail … and could have been extended to connect to the Kelana Jaya LRT Line at Kelana Jaya and the Ampang LRT Line at Puchong.

While the 7 month period of testing and commissioning is a bit of a surprise, we expect that this is also related to the re signalling of the monorail system which will allow for faster train movements.

Overall TRANSIT is pleased but will reserve final judgment until we ride the new trains.

ADUNs in Petaling Jaya call for PJ LRT instead of proposed Kinrara Damansara Expressway

Transit took note of the proposal from 4 ADUN in the Selangor State Assembly (representing Petaling Jaya) that the route of the proposed Kinrara Damansara Expressway (a.k.a. “KiDex” or “KIDEX Skyway“) would be better utilized for public transportation.

Image of proposed Rapid Transit (orange) in KiDex corridor (blue)

Continue reading ADUNs in Petaling Jaya call for PJ LRT instead of proposed Kinrara Damansara Expressway

New Ampang Line trains introduced (update 1)

Prasarana and RAPIDKL will be introducing the new Ampang line trains at 3 pm on Thursday, February 27th.

Click on the links below for images of the trains.
http://t.co/1CfbldOlEt
http://t.co/qrpqoeJR9k

Update:

This article by fz.com is one of many with details about the new trains which will begin arrival in Malaysia in September 2014.

The important details:

*50 units of 6-car trains designed and built by CAR Zhuzhou (which also built the “Six Car Set” for KTM Komuter)
*30 of these trains will replace the trains currently used on the Ampang line … which are only entering their 20th year (generally train carriages are expected to last approximately 30 years … Although the measurement is really based on kilometers traveled rather than time in service)
*20 of the trains will be used on the Ampang line extension when it opens in 2016
*The trains will have open gangway allowing passengers to walk between all the cars (as compared to the 3 pairs of cars in the current trains) spreading out the passenger load